Project - Bridges

 

Project - Bridges double_arrow Stonecutters

Stonecutters Bridge, Hong Kong


Total Tonnage : 15,000 tonnes
Project Type : Surfacing


pin_drop Google Map

The main span of Stonecutters Bridge is 1,296m. The 30.6m wide cable-stayed bridge carries dual three-lane carriageways. Together with Nam Wan Tunnel, Tsing Sha Tunnel, Tsing Ma Bridge, Ting Kau Bridge, Route 8 and Route 3, it provides a direct link between Shatin, the airport and the western part of Hong Kong. The bituminous surfacing comprises 27mm mastic asphalt base course and 31mm SMA wearing course.